Earned Value Management Example

Life Cycle Stock Analyzer Views

EVM Totals Analysis

Introduction
This tool generates a variety of basic life cycle stock statistics for DevTreks capital budgets and operating budgets.

Calculation View Description
Sample analysis used in a DevTreks tutorial. v171a

Version: 1.7.0

Feedback About commercial/investmentgroup/Earned Value Management Example/275505678/none

Step 1 of 3. Make Selections


Date:

Step 2 of 3. Analyze

Relations

Use In Descendants?
Overwrite Descendants?

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Method 2. Do you wish to save the analysis as comma-separated, column-row, text? This format is amenable to further analysis in standard statistical packages. The text can be downloaded by packaging and downloading this uri.



Instructions (beta)

Step 1

  • Step 1. Base Calculations To Analyze: Make sure the data being analyzed corresponds to either operating budgets or capital budgets.
  • Step 1. Analysis Type: Totals add together the resource stocks being analyzed. Mean and Standard deviationis not available yet.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
DevTreks -social budgeting that improves lives and livelihoods
Investment Group : Earned Value Management Example
Benefits
SubBenefit Name SubBenefit Amount SubBenefit Unit SubBenefit Price SubBenefit Total SubBenefit Unit Total SubBenefit Label
RR Track Installed 4.996 mile 3,500,000.00 2,498,000.00 2,498,000.00 EVM1
This measures the unit value of 1 mile of installed railroad track.
Land 4.996 mile 3,500,000.00 2,498,000.00 2,498,000.00 re01
This subbenefit values the land purchased for a railroad.
Totals --- Total Revenue Total EAA Total LCB Total Unit Benefit
Totals --- 4996000.00 0.00 4996000.00 4996000.00
Costs
SubCost Name SubCost Amount SubCost Unit SubCost Price SubCost Total SubCost Unit Total SubCost Label
Materials 6.001 mile 700,000.00 600,100.00 600,100.00 m01
EVM tutorial example.
Labor 12.002 mile 3,150,000.00 2,700,450.00 2,700,450.00 l01
EVM tutorial.
Equipment 6.001 mile 1,050,000.00 900,150.00 900,150.00 e01
EVM tutorial example.
Land 6.001 2,100,000.00 1,800,300.00 1,800,300.00 re01
EVM tutorial.
Totals Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Totals 2700450.00 900150.00 2400400.00 6001000.00 6001000.00 0.00
Investment : 01 RR Track, Planned
Benefits
SubBenefit Name SubBenefit Amount SubBenefit Unit SubBenefit Price SubBenefit Total SubBenefit Unit Total SubBenefit Label
RR Track Installed 4.000 mile 2,000,000.00 2,000,000.00 2,000,000.00 EVM1
This measures the unit value of 1 mile of installed railroad track.
Land 4.000 mile 2,000,000.00 2,000,000.00 2,000,000.00 re01
This subbenefit values the land purchased for a railroad.
Totals --- Total Revenue Total EAA Total LCB Total Unit Benefit
Totals --- 4000000.00 0.00 4000000.00 4000000.00
Costs
SubCost Name SubCost Amount SubCost Unit SubCost Price SubCost Total SubCost Unit Total SubCost Label
Materials 4.000 mile 400,000.00 400,000.00 400,000.00 m01
EVM tutorial example.
Labor 8.000 mile 1,800,000.00 1,800,000.00 1,800,000.00 l01
EVM tutorial.
Equipment 4.000 mile 600,000.00 600,000.00 600,000.00 e01
EVM tutorial example.
Land 4.000 1,200,000.00 1,200,000.00 1,200,000.00 re01
EVM tutorial.
Totals Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Totals 1800000.00 600000.00 1600000.00 4000000.00 4000000.00 0.00
Time Period : 2013, Time Period 01, Planned
Investment : 02 RR Track, Actual
Benefits
SubBenefit Name SubBenefit Amount SubBenefit Unit SubBenefit Price SubBenefit Total SubBenefit Unit Total SubBenefit Label
RR Track Installed 0.996 mile 1,500,000.00 498,000.00 498,000.00 EVM1
This measures the unit value of 1 mile of installed railroad track.
Land 0.996 mile 1,500,000.00 498,000.00 498,000.00 re01
This subbenefit values the land purchased for a railroad.
Totals --- Total Revenue Total EAA Total LCB Total Unit Benefit
Totals --- 996000.00 0.00 996000.00 996000.00
Costs
SubCost Name SubCost Amount SubCost Unit SubCost Price SubCost Total SubCost Unit Total SubCost Label
Materials 2.001 mile 300,000.00 200,100.00 200,100.00 m01
EVM tutorial example.
Labor 4.002 mile 1,350,000.00 900,450.00 900,450.00 l01
EVM tutorial.
Equipment 2.001 mile 450,000.00 300,150.00 300,150.00 e01
EVM tutorial example.
Land 2.001 900,000.00 600,300.00 600,300.00 re01
EVM tutorial.
Totals Total OC Total AOH Total CAP Total LCC Total Unit Total EAA
Totals 900450.00 300150.00 800400.00 2001000.00 2001000.00 0.00
Time Period : 2013 Time Period 01, Actual
Dataset: Earned Value Management Example IRI This building construction benefit and cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress capital budget analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.